Projects DOC Cheese


DOC Cheese

DOC Logo

Customer: DOC Cheese
Location: Hoogeveen
Website: https://www.dockaas.nl

Date: February 2021

Activities:

· pressure transmitter calibration

· flow transmitter verification

Description:

Because an installation did not achieve the values ????that were expected, a calibration had to be carried out on a pressure transmitter and a flow transmitter in this installation. This is to see where the problem with the installation came from. By responding quickly, we were able to help the customer the same day. By performing the calibration of the pressure transmitter and ultrasonically verifying the flow transmitter, we have provided the customer with sufficient data to make a better problem analysis.

Date: February 2021

Activities:

·Advice on calibration equipment and management system

Description:

Updated the technical service staff on the latest calibration equipment and calibration management systems. Should our equipment be given a demonstration of how efficiency can be achieved when carrying out calibrations?